Case studies

Case studies across the North West

A snapshot of jobs we've delivered — what the problem was, how we solved it, and what it meant for the client.

Dockside Crane Structural Inspection

Problem
An ageing dockside crane required a full structural inspection without taking the berth out of service for scaffold erection.
Method
A two-person IRATA-trained team accessed the crane jib, A-frame and counterweight by rope over two consecutive night shifts, capturing 600+ geo-tagged photographs and ultrasonic thickness readings.
Outcome
Detailed defect report delivered within 4 working days. Two priority repairs identified before they became critical — saving an estimated £180k in unplanned downtime.
Related service

32-Storey Tower Façade Clean

Problem
A new build-to-rent tower needed quarterly façade cleaning. Cradle access was unreliable and disrupted residents.
Method
Two pairs of rope technicians worked a planned drop sequence over 5 days, using pure-water systems for glazing and biocide for stained cladding panels.
Outcome
Zero resident complaints. Programme now runs on a rolling 90-day cycle with a fixed-price contract.
Related service

Distribution Centre Gutter & Roof Clean

Problem
300m of valley gutter on a logistics shed had blocked, causing internal water ingress over a packing line.
Method
Rope access teams worked from existing roof anchors with vacuum gutter cleaning equipment, also installing temporary mansafe lines for future inspections.
Outcome
Gutters cleared in two shifts with zero operational disruption. Annual maintenance contract now in place.
Related service

Eyebolt Recertification — Commercial HQ

Problem
120 eyebolts across a 14-storey HQ were due for annual pull-test certification under BS 7883.
Method
A 3-person team completed pull-testing, defect tagging and certification in a single mobilisation, replacing 4 failed anchors on the same visit.
Outcome
Full BS 7883 certification issued the following morning. Client now uses Maillon for all working-at-height anchor compliance across their UK estate.
Related service

Structural Steelwork Coating Refurbishment

Problem
A national infrastructure client needed corrosion control across a span of exposed structural steelwork without erecting scaffolding.
Method
Rope access teams blasted to SA 2.5, applied a three-coat protective system, and worked overnight shifts to avoid operational disruption.
Outcome
Project completed two weeks ahead of programme with full ICATS-standard documentation.
Related service

Need a quote on a working-at-height job?

Tell us about the asset and what needs doing. We'll come back within one working day with a clear, fixed-price proposal.